Example · Linear cutting

Lumber shelf frame

Four 8 ft 2×4 studs are enough for the four uprights and six rails of a shelf frame. The example shows how parts of different lengths share boards of equal length.

Open and edit in the planner

Free · No sign-up needed · Your data stays with you

Stock piece 1 / 4
2×4 stud, 8 ft 1 · 96 in1 · Upright441 · Upright447 3/496 in
Stock piece 2 / 4
2×4 stud, 8 ft 2 · 96 in1 · Upright441 · Upright447 3/496 in
Stock piece 3 / 4
2×4 stud, 8 ft 3 · 96 in2 · Rail182 · Rail182 · Rail1841 5/896 in
Stock piece 4 / 4
2×4 stud, 8 ft 4 · 96 in2 · Rail182 · Rail182 · Rail1841 5/896 in

Result

  • 10 / 10 Parts placed
  • 4 Stock pieces
  • 10 cuts
  • 74.0 % Material use
  • 1 1/4 in Saw loss
  • 41 5/8 in largest offcut

✓ Geometry independently validated

Your stock

  • 2×4 stud, 8 ft: 4 × 96 in · Available stock

Parts to cut

  • Upright: 4 × 44 in
  • Rail: 6 × 18 in

Rules

  • Material group: SPF · 2×4
  • Saw kerf: 1/8 in
  • Edge trim: 0 in

Cutting sequence · Stock piece 1

  1. Piece 96 in: cut at 44 in from the start. Leaves 44 in and 51 7/8 in; kerf 1/8 in.
  2. Piece 51 7/8 in: cut at 44 in from the start. Leaves 44 in and 7 3/4 in; kerf 1/8 in.

Linear cutting optimizer →